Step One:

Design & Engineering

  • Topographical & Land Survey
  • Soil Testing & Geotechnical Investigation
  • Solar Resource Assessment (Irradiance, CUF, PR Studies)
  • Plant Layout & Shadow Analysis
  • Module String Sizing & Inverter Sizing
  • Structural Design of MMS (Fixed / Tracker)
  • AC & DC Electrical System Design
  • SCADA & Communication Architecture Design
  • Load Flow & Short Circuit Studies
  • Grid Compliance Studies & Protection Scheme
  • Approval Drawings for DISCOM / SLDC
Design & Engineering
Civil Work
Step Two:

Civil Work

  • Site Survey & Land Development
  • Layout Marking
  • Boundary Wall / Fencing
  • Foundation & Erection for Module Mounting Structures
  • Inverter Room & Control Room Construction
  • Cable Trenches & Ducting
  • Water Drainage System
  • Tracker / Fixed Tilt Installation
  • PCC for Inverter Skids, Transformers, and Switchyard
  • String Monitoring Box/Inverter Placement
  • Switchyard Construction (33kV/66kV/132kV as per design)
Electrical Work
Step Three:

Electrical Work

  • Earthing Grid & Lightning Arrestor Installation
  • DC Cabling & String Terminations
  • AC Cabling (LV & HV) Laying
  • Inverter to Power Control Center Cabling
  • Breaker Installation and Termination
  • HT Cable Laying up to Transmission Line / Substation
  • Protection Relay Coordination
  • Inverter Installation and Commissioning
  • Auxiliary & Power Backup Setup
  • SCADA Installation & Integration
  • Transformer Installation and Commissioning
  • Relay and Breaker Commissioning
Transmission & Grid Connectivity
Step Four:

Transmission & Grid Connectivity

  • Transmission Line Construction (as per voltage level)
  • CT/PT & Metering Installation at PSS
  • Power Transformer Installation and Commissioning at PSS
  • Bay Extension at Utility Substation
  • Protection & Control Scheme Approval from DISCOM/SLDC
  • Control & Relay System Setup
  • HT Termination & Synchronization with Grid
Regulatory & Approvals
Step Five:

Regulatory & Approvals

  • CEIG Approval for Electrical Drawings & Safety
  • CTU/STU Open Access Application
  • SLDC Registration & Scheduling Permission
  • Connectivity Approval from DISCOM / STU
  • Metering Approval (Energy & ABT Meters)
  • Grid Synchronization Permission
  • Final Commissioning Certificate from CEIG

Delivering Excellence Across India

Pan India Solar Presence
At a Glance

map
author thumb
Rajasthan - Bikaner
author thumb
Himachal Pradesh
author thumb
Uttar Pradesh - Prayagraj
author thumb
Tamil Nadu - Coimbatore
author thumb
Haryana - Faridabad
author thumb
Punjab - Mandi